Newbridge Court

Middlesbrough

Brims Construction were successfully appointed by Middlesbrough Development Company, to carry out the redevelopment of the former Tolesby Shops in Acklam, Middlesbrough. The scheme involved the transformation of a disused site into a ground floor retail facility and 24nr mixed one- and two-bedroom affordable apartments, the retail space provides a much-needed commercial boost to the area.  The works involved the site preparation, followed by the construction of the four-storey building, on a brownfield site, located quite centrally within a well-established residential area of Tolesby. The Newbridge Court site was occupied by six small shops and a car repair garage, which were  subsequently demolished. The site is flat and approximately 0.3ha in size.

The accommodation includes :-

Ground Floor

  • Nursery facilities for 2-3yrs and 3yrs +
  • Retail Space A
  • Retail Space B
  • Retail Space C
  • Refuse & Recycle Store

First Floor

  • 10 No. Residential Apartments

The development included the installation of all associated hard and soft landscaping, including car parking and street lighting. The ground floor construction comprised of a ground floor podium, with shuttered concrete first floor. The upper floors comprise of pre-cast concrete planks. The internal walls comprise a mixture of concrete blocks and metal stud partitions, and the flat roofs are covered in single ply membrane. The external walls to the third floor are faced with composite cladding. The retail units were be constructed to a shell / core level only.

Tony Dodds, the Managing Director of the Middlesbrough Development Company, said:

From their comments we know that local people are looking forward to welcoming this new community.  There was always a desire to get some commercial use back on this site and I think a mixed scheme like this will be highly successful. 

It’s a difficult time for retailers but we’re confident there will be the right level of business they are going to need.  That’s going to come from the people living here as well as the residents in the surrounding area.”

Stats

Client

Middlesbrough Development Company

Architects

Gradon Architecture

Engineers

3E/RPS Group

Construction Value

£5.5 million

Duration

60 weeks

Location

Middlesbrough