Cheviot House Refurbishment

Newcastle

Bernicia Group appointed Brims Construction to carry out refurbishment works to their existing Office Space at Cheviot House, Kingston Park, Newcastle. The works were carried out in a live office environment, which required careful programming and sequencing to ensure minimal disruption to Bernicia’s employees and anyone visiting throughout the duration of the works.

The Cheviot House Office refurbishment works included: Alterations to internal walls, partitions, and folding partitions, removal of existing suspended ceiling tiles and grid replacing with new. Removal of existing wallpapers, ceramic tiles and making good existing decoration. Removal of existing carpet tiles, barrier matting, tiled flooring and replace with new. Refurbishment to stairs and atrium features. Redecoration of skirting, woodwork, Installation of new glazed screens & doors. Electrical works including update of general power/data, replacing all lighting installations, access control, CCTV, intruder alarms, fire alarms, disability assistance and testing/ commissioning of all electrical works. Mechanical works including new heating installation throughout the building (radiators), installation of extract fans/ducting and above ground drainage.

“Throughout the construction process the conduct of the Brims site management team was excellent with all works undertaken in a professional and efficient manner. The management and coordination of the various sub-contract trades was handled particularly well by the Project Manager, resulting in a successful and pleasant experience for all concerned.
Due to Bernicia Homes needing the building to be operational while the works were carried out, the team at Brims programmed the construction works carefully to avoid disruption as much as possible ensuring the programme of works remained on schedule for completion in September 2022. As a result, they have successfully delivered a high-quality office refurbishment building on time, within budget and to the exacting standards we required. I would have no reservation in recommending Brims to any future Clients and we look forward to working with them again in the future.”

Jeff Boyd, Assistant Director, Development Bernicia

Stats

Client

Bernicia

Architects

Anthony Watson

Engineers

Kyoob

Construction Value

£1.1 million

Duration

35 weeks

Location

Newcastle